Pool Support Solutions

Pools are significant investments, and when the ground around them starts to shift, the consequences can be expensive and stressful. A settling pool deck creates trip hazards. Cracking around the pool shell can lead to leaks. And if the pool structure itself shifts, the repair costs escalate quickly.
Pool settlement is especially common in the Lower Mainland because many pools are built on fill material that compacts over time, or on clay soils that expand and contract with seasonal moisture changes. The heavy weight of the water, combined with the constant wet-dry cycling of the surrounding soil, creates conditions that challenge even well-built pool installations.
The tricky part about pool settlement is that it often happens gradually enough that you don’t notice until the damage is significant. The pool deck develops a slight slope. Coping stones start to separate. The water line looks uneven against the tile. By the time these signs are obvious, the movement has been progressing for some time.
At Ossum, we use Ram Jack® steel pier systems to stabilize pool structures and decks on permanent foundations. Rather than trying to patch the symptoms, we address the soil problem underneath by transferring the load to stable bearing strata. This stops the settlement and, in many cases, allows us to lift settled sections back toward their original position.
Pool support projects require careful planning because of the water, plumbing, and electrical systems involved. We work with your pool contractor to coordinate the work and ensure nothing is disrupted. Our goal is to stabilize your pool investment permanently so you can enjoy it without worrying about what’s happening underground.
Signs You Need This Service
Our Process
Pool and Deck Assessment
Engineered Support Plan
Pier Installation
Stabilization and Lift
Completion and Restoration
Systems & Solutions
Ram Jack® Helical Piles
Engineered Brackets
Featured Projects
Frequently Asked Questions
In most cases, no. The majority of pool support work involves the deck and surrounding structures, which can be repaired while the pool remains filled. If the pool shell itself needs to be addressed, partial or full draining may be required, but we’ll discuss this during the assessment.
Yes. Our approach stabilizes the existing deck from below using steel piers, then lifts settled sections back toward their original position. This preserves your existing deck rather than tearing it out and starting over, which saves significant cost and disruption.
The timeline depends on the number of piers required and the complexity of the pool area. We schedule the work to minimize impact on your pool usage.
Yes. The piers transfer the deck and pool structure loads to stable bearing soil below the surface, bypassing the problem soils that caused the original settlement. Our 20-year warranty covers the pier system against future settlement.
The most common causes are poorly compacted fill material placed during pool construction, clay soils that expand and contract with moisture changes, and erosion beneath the deck caused by water runoff or pool splashing. The heavy weight of the water in the pool also contributes to settlement of surrounding soils over time.
Why Professional Support Matters
Mudjacking or foam injection can temporarily raise a settled pool deck, but these methods don’t address the underlying soil problem. The settlement typically returns within a few years because the soil underneath is still unstable. Engineered steel piers reach stable ground below the problem zone and provide a permanent solution that won’t need to be repeated.


